Nice list online from
www.constructioncleanup.com/roughclean.shtmlPhase One: Framing Rough Clean
Remove all wood and debris from interior, around exterior perimeter and in courtyard of unit. Stack all lumber in front of each house to be placed in dumpster. Sweep for framing inspection after electricians and plumber (one sweep).
Phase Two: Box Out Rough Clean
Remove all roofing debris, including clay tile, nails, paper and pallets from perimeter of unit. Finish rough clean(one sweep).
Phase Three: Painting Rough Clean
Remove all wood debris generated from cabinets and finish carpentry. Remove all ceramic tile and/or marble slab and tile, including boxes, wrappers, etc. from interior and exterior of unit.
Sweep entire interior and exterior of unit.
Sweep and scrape entire interior of unit (not including windows).
Remove all boxes, paper and debris from interior of unit, outer perimeter and courtyard of unit.
Phase Four: Box Out Cleaning For Inspection Rough Clean
Wash interior window glass.
Wash exterior window glass and exterior window sash.
Pick up and throw out packing cases and sweep after plumbers and electricians finish.
Scrape and sweep for carpet pad.
Pick up building debris ahead of finish grade.
Sweep garbage.
Clean for inspection and acceptance to include:
a.) Wash plumbing fixtures and remove labels from sinks, bathtubs, showers, commodes, mirrors in lavatories, kitchen and bathrooms.
b.) Dust cabinets, closets, base, window sills, window and door tracks, fireplace and exterior of appliances.
c.) Clean counter tops.
d.) Sweep and mop floor tile.